Motion Computing FWS-DS1 Bedienungsanleitung Seite 193

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 257
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 192
GTE
-
Florida
Wholesale Non-recurring Cost
Study
Provisioning
-
Advanced/Special
Products
Dark
Fiber
-
Work
Times
Ln
Description
Dark Fiber
Preordering
Exchange Facilities
Design Group
Access
OSP
En-beer
Construction
Splicei
i
Total
Inter-office Facilities
Design Group
Access
I
OSP
Engineer
Total
Network
Construction
Splicei
7
OSP
Engineer
8
Construction
Splicei
9
Total
Source Minutes Destination
A=Note
1
219.25
APLC-1
24.00
APLC-1
urn
Lns
(1.2)
243.25
APRI-1
205.00
APLC-1
60.00
APLC-1
urn
Lns
(4.5)
265.00
APRI-1
209.50
APLC-1
APLC-1
urn
Lns
(7.8)
209.50
APRI-1
Note
1:
The
work times listed were developed through interviews with Engineering Supervisors
and
Staff
Support.
GTE
Confidential
AFMC-1
Seitenansicht 192
1 2 ... 188 189 190 191 192 193 194 195 196 197 198 ... 256 257

Kommentare zu diesen Handbüchern

Keine Kommentare