Motion Computing FWS-DS1 Bedienungsanleitung Seite 74

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 257
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 73
GTE
-
Florida
Unbundled Network Element
(UNE)
Non-Recurring Cost Study
features
in
the switch match 'both the AAIS inventory and the customer requested features
on
the order.)
DBM- WCC
The DBM -WCC reviews all Access Service Requests (AS&) for completeness and
routes the order to the correct DBM group. Specialists in the DBM perform translations
and routing information for the Exchange
-
Complex
UNEs
such
as
CentraNet
Port,
and
for the AdvancedSpecial
-
Complex
UNEs
such
as
ISDN
-
PRI.
This group receives the
information that details the specific vertical features, switch feature groups, and routing
instructions of the ordered service. The DBM specialist codes this information and then
enters the translations into the network switch.
VIVID
The service coordinators
in
VIVID manage the critical dates for some types of
UNERJNE-P orders. They escalate the order when a milestone is missed. They also
perform root cause analysis
to
improve the provisioning process.
BRPC
The BRPC has Plant Control Office and desigdengineering responsibilities for
AdvancedSpecial
Ws.
The BRPC is comprised
of
five su/jointfilesconvert/293884/bgroups: Scheduler/Screener
(SOE), HiCap Prework, Design, Testing, and Administration (Admin).
The BRPC
SOE
receives orders from the NOMC and NACC. The
SOE
group verifies
that the NOCV/EXACT orders are properly entered into Telecom Business Solutions
(TBS); if the orders were not downloaded electronically into
TBS,
the scheduler/screener
enters the order manually. The Scheduler/Screener checks the order for accuracy and
completeness, ensuring that the order contains all of the information needed by the other
BRPC groups. The Scheduledscreener routes the order to the required work groups by
entering a distribution code into TBS.
The BRPC HiCap Prework group reserves and assigns the facilities for
all
DSl and above
orders.
The BRPC Design group creates the Circuit Layout Record (CLR), which is used to
install and test the circuit. The designer ensures that the central office has the correct
equipment for the circuit, and that the facilities have been reserved for the circuit. The
designer routes the completed CLR to the testing group, central office, and dispatch
centers.
The BRPC Testing group is responsible for coordinating testing
with
the Central Office,
Field, and CLEC. The testing group completes circuit tests by the Plant Test Date (PTD)
or Due Date @D) listed in TBS. When necessary, the tester will update TBS for design
(i.e., equipment) changes.
1s-FL
3
whdesrlr,
-
Ju~2000
Page
3
of
7
Seitenansicht 73
1 2 ... 69 70 71 72 73 74 75 76 77 78 79 ... 256 257

Kommentare zu diesen Handbüchern

Keine Kommentare